The 103 group worked hard today to go from an empty board on the wall to the pictures below.
Michael has done a great job letting the students do the work, the problem identification and finding solutions. The video below is a little jumpy, but it shows the students diagnosing a couple of leaks and Michael standing "in the back" letting them be "in front".
The walls of the water room are solid concrete 9-10" thick. The team took turns with a 5lb hammer and chisel kicking a hole through wall to plumb the pipe from the raw water tank to the filling station.
The water treatment system will be operational tomorrow.
Subscribe to:
Post Comments (Atom)
Final day in Ghana
We spent the morning with the PCG at their offices which are located in the central part of Accra. After meeting - we walked around the c...
-
We arrived in Ghana yesterday (Saturday) around 8:00 a.m. All went well, except Ralph Young's personal bag didn't make the trip fro...
-
The water treatment system installation team is thoroughly cleaning the inside of the tank to prepare for creating the first batch of purifi...
No comments:
Post a Comment